Bozuyuk Terminal is used by the ceramic industry which is quite strong in region. Terminal is now in city center. Construction works are going on at the east of city, next to Bozuyuk Industrial Zone, for the Bozuyuk Logistics Center, which is one of the 19 logistics centers planned by TCDD.
General Information
Station code is 01923 – 2
Open to freight traffic
Open to international traffic
Weighbridge exists
No loading gauge meter
Location
Sidings
There are 5 lines at the terminal
2 sidings for handling (150+60 m long)
Storage
3400 sqm open storage area
75 sqm covered storage area
Distance to Borders
Kapıkule / Svilengrad (BG) : 350 km
Uzunköprü / Phytion (GR) : 312 km
Kapıköy / Razi (IR) : 1687 km
Nusaybin / Kamichli (SYR) : 1552 km *
Islahiye / M.Ekbez (SYR) : 1020 km *
Çobanbey (SYR) : 1283 km *
Doğu Kapı (AM) : 1673 km *
Ahılkelek/Akhalkalaki (GE) : 1714 km **
* Rail border crossings to Syria and Armenia are closed
** Border crossing to Georgia is under construction
Contacts
TCDD Tel: +90 228 315 10 63
Cover Photo: Turkon ©
Categories: Freight Terminals