Siemens Konzernzentrale München/ Siemens headquarters Munich

Siemens awarded for signaling of Samsun Kalin railway

Siemens is to supply signaling technology of Samsun-Kalin railway.

The 378-km-long single-track Samsun-Kalin railway connecting Samsun Port in Black Sea to Central Anatolia was started to be reconstructed last year.

By modernization of the rails and signaling equipment, maximum speed of trains will be increased from 70 to 120 km/h, cutting the journey time between Samsun and Kalin from nine to five hours.

Samsun – Kalin railway project

Siemens is supplying the electronic interlocking systems, point machines, level-crossing technology, communication technology, and the train control system ETCS (European Train Control System) Level 1 for the route. The contract also includes equipping the operations control center located in Samsun.

Commissioning of the route is scheduled for the end of 2017.

Siemens was awarded for signaling of Istanbul M1 metro line, Bandirma-Menemen railway, Konya-Ankara high speed train line and Marmaray Tunnel.

Cover Photo: http://www.siemens.com/press

Related Articles:
Samsun-Kalin Railway to Close
No Trains to Samsun for 2 Years

Leave Your Question/Comment

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s